by admin | Jul 1, 2019 | Religious Projects
FUMCH Day Care, Orlando, Florida. The project is new 20,000 SF day care. The structure is precast concrete wall panels, light gauge trusses at 24” o.c. with plywood deck and interior steel beams and...
by admin | Jul 1, 2019 | Religious Projects
FUMC Social Hall, Clermont, Florida. The project is a two-story social hall with 36,733 SF with a partial basement. The building is a pre-engineered metal building with exterior precast concrete wall panels. There is a flat roof area framed with steel joists and steel...
by admin | Jul 1, 2019 | Religious Projects
LDS Key West, Key West, Florida. The project consists of an elevated 5,500 SF single-story worship space and classrooms. The finish floor elevation must be four to five feet above grade. The structural system will be pre-manufactured wood roof trusses supported by...
by admin | Jul 1, 2019 | Religious Projects
LDS Riverside, Miami, Florida. The project is an 11,620 SF two-story meeting house. The structural system is perimeter precast concrete walls, hollow core floor slab with concrete topping, pre-manufactured metal roof trusses and metal roof...
by admin | Jul 1, 2019 | Religious Projects
FUMC Children’s Home Bell Cottages, Enterprise, Florida. The project includes two (2) identical one-story cottage buildings with an area of 4,970 SF each. The total area for both building is 9,940 SF. The structural system is pre-manufactured wood roof trusses...