Orlando Health Central/UF Cancer Center, Ocoee, Florida. The project includes two-story 30,000 SF building with linear accelerator concrete vault. The structure is tilt-up concrete wall panels, structural steel frame with composite steel floor beams, steel joists and metal deck. The concrete vault has mass concrete foundations, walls and roof slab. The exterior wall is a combination of tilt-up wall, curtain wall and metal studs with insulated metal panels. Project requires special detailing for architectural features.