by admin | Jul 1, 2019 | Religious Projects
Wekiva Presbyterian – Classroom Facility, Orlando, Florida. A two-story 13,600 SF expansion of an existing classroom facility. The new construction required a four-hour wall at the existing sanctuary and coordination with the existing two-story classroom building. The...
by admin | Jul 1, 2019 | Office Building Projects
Sonata Nemours MOB, Orlando, Florida. The project is a 12,300 SF medical office building. The structure will be precast concrete panels with some metal frame construction at parapets and sloped roofs, metal joist and metal deck roof structure and monolithic concrete...
by admin | Jul 1, 2019 | Office Building Projects
Sonata West MOB II, Winter Garden, FL. The project is a 48,000 SF 2-story shell medical office building. The structure will be precast concrete panels or reinforced masonry walls at perimeter, interior columns, structural steel, steel joists and metal deck. The 2nd...
by admin | Jul 1, 2019 | Office Building Projects
Kissimmee City Centre Office, Kissimeee, Florida. The project includes a three-story office building located in downtown Kissimmee. The building measures 100 feet x 120 feet with 12,000 SF per floor for a total of 36,000 SF. The structure is steel framed supporting a...
by admin | Jul 1, 2019 | Office Building Projects
Orange Lake Town Center Office and Retail Building, Orlando, Florida. The building is a two-story office building with a total area of approximately 57,000 SF. The building included 47,000 SF of office space and 10,000 SF for retail. The structural system is exterior...